Services Projects Why it pays Contact Request a quote
Chartered BIM engineers · Scan to BIM · Clash detection

Full-scope BIM services — from survey to finished model.

We build all-discipline models, clash-free installation drawings and precise on-site survey — so the project comes together flawlessly before construction even starts.

15+ years experience 30+ completed projects Domestic & international projects Chartered BIM engineer on the team
BIM MEP koordinációs látványterv — épületgépészeti modell
Our services

How we help

Four core services that construction and design rely on most — from survey to clash-free drawings.

All services →
Why it pays

Usable model and data — that holds up on site, too.

There’s no such thing as a flawless set of drawings — clashes and gaps sit in almost every project. The only question is whether we catch them cheaply in the model, or pay for them on site. Here’s where it pays off:

The work is done by a chartered BIM engineer
2–3%
Less rework
On-site rework can eat 5–15% of project cost — thorough model coordination can cut it to 2–3%.
up to −30%
No slip in installation
With clash-free installation drawings there are no stoppages on site; in our experience slippage drops significantly.
15–30%
Less material waste
Accurate model-based quantities mean fewer needless orders and less construction waste.
up to 10%
Prevention, not repair
We screen out clashes in the model, not on site — timely clash detection can save up to 10% of contract value.
The percentages are typical ranges from industry research and case studies; actual return is project-dependent.
The team

A team that understands construction — not just the software

Several competencies work together on your project, in one place. That’s why the model doesn’t just look good — it holds up on site too.

Chartered BIM engineer

Modeling and coordination are led by a qualified BIM engineer — not a general drafter.

Designer with unlimited licence

Understands design logic and regulations, so the model stands up from a design standpoint too.

Construction project manager

Knows the on-site schedule and the reality of installation, so the drawings are genuinely buildable.

Technical inspector

One accountable professional vouches for technical quality and compliance.

This combination means you get the survey, the model, the clash-free drawings and a buildable solution from one place — no need to align separate firms yourself.
Our projects

Featured projects

Our earlier work proves it: our approach and expertise stand out on domestic and international projects alike.

Játékelemgyár BIM modell — NyíregyházaNyíregyháza

Toy-parts Factory

BIM · scanning · clash · coordination

A multi-phase, long-running industrial investment — with laser scanning, BIM modeling, clash detection and as-built drawings.

2014–2024>100,000 m²
AZ Jan Palfijn Kórház BIM modell — GentGent, Belgium

AZ Jan Palfijn Hospital

BIM · construction support · operations

We supported construction with clash detection, installation drawings and as-built docs; the model was loaded with data for operations.

201550,000 m²
BSZL B9 Irodaépület BIM modell — BudapestBudapest

BSZL B9 Office Building

BIM · clash detection · as-built

For the general contractor we ran the full delivery: a coordinated model, multi-round clash detection and as-built drawings to handover.

20198,000 m²
Coca-Cola HBC telephely felmérés — DunaharasztiDunaharaszti

Coca-Cola HBC

Survey · Scan to BIM

Accurate on-site survey and digital processing of the existing stormwater drainage system at the Dunaharaszti site.

202470,000 m²
VALEO tisztatér BIM modell — VeszprémVeszprém

VALEO cleanroom extension

BIM · clash · coordination

Cleanroom production extension with a full discipline BIM model, clash detection and coordination.

20241,000 m²
Minaro Hotel BIM modell — TokajTokaj

Minaro Hotel *****

BIM · clash · coordination

A full BIM model of a five-star hotel with clash detection, coordination and as-built drawings.

202210,000 m²
Schiller autószalon BIM modell — BudapestBudapest

Schiller car showroom & workshop

BIM · clash · coordination

BIM modeling, clash detection and discipline coordination of a car showroom and service workshop.

20219,000 m²
AVL irodaépület BIM modell — ÉrdÉrd

AVL Office Building

BIM · clash · coordination

A full discipline BIM model of an office building, with clash detection and coordination to support construction.

20233,250 m²
Hübner gyártócsarnok BIM modell — NyíregyházaNyíregyháza

Hübner — H4 Production Hall

BIM · clash · coordination

BIM modeling, clash detection and coordination of a production hall, aligning industrial MEP with the structure.

202010,000 m²
Kórházi épületszárny BIM modell — BelgiumBelgium

Hospital wing

BIM · discipline modeling

Discipline BIM modeling of a Belgian hospital wing — our international healthcare reference.

2014International
Kollégium BIM modell — BelgiumBelgium

College building

BIM · all-discipline model

Full all-discipline BIM model of a Belgian college building in one model, with clash detection.

2013International
Irodaépület BIM modell — BelgiumBelgium

Office building

BIM · all-discipline model

Full all-discipline BIM model of a Belgian office building in one model, with clash detection.

2013International
Iskolaépület BIM modell — BelgiumBelgium

School building

BIM · all-discipline model

Full all-discipline BIM model of a Belgian school building in one model, with clash detection.

2013International
Executive Plaza irodaépület BIM modell — New YorkNew York, USA

Executive Plaza Office

BIM · structural · architectural

An international office project: structural and architectural BIM modeling for the overseas client.

2012International
Irodaház BIM modell I. — New YorkNew York, USA

Office Building I.

BIM · structural · architectural

One of two Manhattan office buildings — structural and architectural BIM modeling, our early US reference.

2011International
Irodaház BIM modell II. — New YorkNew York, USA

Office Building II.

BIM · structural · architectural

The project’s second Manhattan office building — structural and architectural BIM modeling.

2011International
30+
Completed projects
250,000+ m²
Area modeled
15
Years experience
3
Countries
Contact

Let’s talk about your project.

Send the project basics — you can attach a drawing or other document. We’ll get back within 48 hours with an indicative quote, no strings attached.

Even when your project is already on site, we can step in: if a clash surfaces mid-construction or you need a quick as-built survey, we start on short notice and fit the site’s pace.
Thank you, we received your message!
Your request has been forwarded to our team. We’ll get back to you within 48 hours at the details you provided — if it’s urgent, call us at +36 30 991 6236.
Request a quote
Sending failed right now. Please email info@bimmodell.hu or call +36 30 991 6236.
By submitting you accept the privacy policy.